road workBullhead City (Ariz), December 11, 2014 – The Bullhead City Roads Department will be performing some minor road work the week of December 15. Following is a list of projects for the week:

  • Crack Sealing – Turney Dr, Palo Verde Dr, Roadrunner Dr, Stahlman Dr, Terrace Dr, Riverfront Dr..
  • Working on the Grand Vista Slope at Silver Creek and Hwy 95.
  • Pothole repairs in Various Locations throughout the City.
  • Please watch out for construction workers and drive carefully through construction zones. For more information, call the City of Bullhead City Street Maintenance Division at 928-763-0184.

728x90-SWG-Safety-Web-Banner_2014