ADOTlogoWork will require brief delays and lane closures

Roadway maintenance is scheduled along State Route 89 (milepost 363) at the Interstate 40 traffic junction as well as the Interstate 40 interchange ramps in Ashfork Tuesday (Feb. 16) through Wednesday (Feb. 17), according to the Arizona Department of Transportation.

Motorists are advised to be alert and prepared for intermittent lane closures in both directions and brief delays from 6 a.m. to 6 p.m. while crews perform preventive maintenance work designed to preserve the existing roadway.

The speed limit will be reduced in the work zone. Motorists are reminded to proceed with caution, slow down, and be alert for construction equipment and personnel.

To stay up-to-date with the latest highway conditions around the state, visit the ADOT Traveler Information Center atwww.az511.gov or call 5-1-1. If you have questions about the project you can email ADOT at projects@azdot.gov or call the agency’s Project Hotline at 1.855.712.8530

728x90-SWG-Safety-Web-Banner_2014