Asphalt Paving

Asphalt Paving

Motorists traveling on State Route 95 from Camp Mohave Road to the Bullhead City Parkway (mileposts 238 to 241) are advised to be alert and prepared for intermittent lane closures in both directions and brief delays beginning Monday (Jan. 4) through Jan. 8 while crews perform preventive maintenance work, according to the Arizona Department of Transportation.

 

The work will require lane closures from 6 a.m. to 6 p.m. Construction will include the application of a protective layer to the pavement, designed to preserve the existing roadway.

 

The speed limit will be reduced in the work zone. Motorists are reminded to proceed with caution, slow down, and be alert for construction equipment and personnel.

 

To stay up-to-date with the latest highway conditions around the state, visit the ADOT Traveler Information Center at www.az511.gov or call 5-1-1. If you have questions about the project you can email ADOT at projects@azdot.gov or call the agency’s Project Hotline at 1.855.712.8530.

728x90-SWG-Safety-Web-Banner_2014